Overview

The Yukhari Vang Hydroelectric Power Station is an operational hydroelectric facility located in the Kalbajar District of Azerbaijan. The plant is situated on the Tartar River, utilizing the water flow of this local river to generate electricity. It is operated by Azerenerji, the primary state-owned energy company in the country. The station represents a recent addition to Azerbaijan's hydroelectric infrastructure, having been commissioned on 2 September 2024. Its establishment contributes to the regional energy mix in the Kalbajar District, providing a renewable energy source derived from the hydraulic potential of the Tartar River.

The installed capacity of the Yukhari Vang Hydroelectric Power Station is 22.5 MW, according to the. This capacity allows the plant to contribute a steady output of renewable energy to the local grid. The technology employed is standard hydroelectric generation, converting the kinetic energy of the flowing water into electrical power. As of its commissioning in 2024, the plant is listed with an operational status, indicating it is actively generating power. The facility is part of the broader efforts to develop hydroelectric resources in Azerbaijan, leveraging the natural water bodies such as the Tartar River to enhance energy security and diversify the fuel sources used for electricity generation.

Location and Setting

The plant is located in the Kalbajar District, a region in Azerbaijan. The specific site is on the Tartar River, which serves as the primary water source for the hydroelectric generation process. The choice of location is strategic, taking advantage of the river's flow characteristics to optimize energy production. The Kalbajar District has seen various infrastructure developments, and the Yukhari Vang HPP is one of the key energy projects in the area. The proximity to the Tartar River ensures a consistent water supply, which is critical for the continuous operation of the hydroelectric turbines.

Operational Parameters

This figure represents the maximum power output the plant can generate under optimal conditions. The operator, Azerenerji, manages the day-to-day operations and maintenance of the facility. The commissioning date of 2 September 2024 marks the official start of its operational life. Since then, the plant has been contributing to the energy grid, providing a renewable source of power. The operational status is currently active, meaning the plant is functioning as designed and delivering electricity to the consumers in the region. The use of water as the primary fuel source makes it a clean energy option, with minimal direct emissions compared to fossil fuel-based power plants.

What is the history of the Yukhari Vang project?

The project represents a recent addition to the national energy infrastructure, with the plant officially commissioned on 2 September 2024. Upon its entry into service, the station began contributing to the regional grid with an installed capacity of 22.5 MW, utilizing water as its primary energy source. The operational status of the plant is currently listed as operational, marking a significant milestone for the Kalbajar District's energy portfolio.

The development of the Yukhari Vang project was overseen by Azerenerji, the primary operator responsible for the plant's management and integration into the broader Azerbaijani power network. As the designated operator, Azerenerji played a central role in the execution and subsequent launch of the facility. The commissioning date of 2 September 2024 signifies the completion of the construction and testing phases, allowing the plant to begin regular power generation. The project's timeline culminates in this 2024 launch, establishing the station as a modern asset within the country's hydroelectric sector.

While the specific details of international specialist involvement are part of the broader project context, the primary operational responsibility rests with Azerenerji. The plant's location on the Tartar River in the Kalbajar District provides the necessary hydraulic head and flow required for its 22.5 MW output. The commissioning in 2024 places the Yukhari Vang Hydroelectric Power Station among the newer installations in Azerbaijan's energy mix, contributing to the diversification of power sources in the region. The facility's operational status confirms its active role in generating electricity, with Azerenerji managing its day-to-day functions and maintenance.

What are the technical specifications of the plant?

The Yukhari Vang Hydroelectric Power Station is classified as a hydroelectric powerplant, utilizing water as its primary energy source. Located in the Kalbajar District of Azerbaijan, the facility is situated on the Tartar River. The plant is currently operational and is managed by the operator Azerenerji. The installed capacity of the station is documented with slight variations across sources, with the specifying 22.5 MW, while structured data lists the capacity as 22 MW. The plant was commissioned on 2 September 2024.

Technical Parameters

Parameter Value
Entity Type Hydroelectric Power Plant
Primary Fuel/Source Water
Country Azerbaijan (AZ)
Region Kalbajar District
Water Body Tartar River
Operator Azerenerji
Commissioned 2 September 2024
Operational Status Operational
Installed Capacity 22 MW (structured data) / 22.5 MW
The provided grounding snippets do not contain specific details regarding the switchyard configuration, SCADA integration, or digital control systems for the Yukhari Vang Hydroelectric Power Station. While modern hydroelectric facilities typically employ SCADA (Supervisory Control and Data Acquisition) systems for real-time monitoring and digital control systems for optimizing turbine performance and grid synchronization, the specific technical architecture of the switchyard or the particular digital control models used at Yukhari Vang is not explicitly detailed in the available sources. The plant's operation is overseen by Azerenerji, which manages the integration of the facility into the broader national grid infrastructure. The commissioning in 2024 suggests the incorporation of contemporary hydroelectric technologies, but without explicit documentation of the switchyard voltage levels or specific SCADA vendors, these details remain general to the era of construction rather than specific to the entity.

How does it compare to other regional hydro projects?

Yukhari Vang represents a targeted expansion of Azerbaijan’s hydroelectric capacity, specifically within the strategic Kalbajar District. Commissioned in 2024, the station contributes 22.5 MW to the national grid, operated by Azerenerji. Its location on the Tartar River places it within a broader regional development strategy aimed at leveraging the water resources of the Kalbajar area. This project is part of a cascade development approach, where multiple stations are built along a single river system to maximize energy output. The Tartar River has been identified as a key resource for hydroelectric generation in the region, with several other projects planned or under construction to complement Yukhari Vang.

Regional Context and Cascade Development

The Kalbajar District is a focal point for Azerbaijan's recent hydroelectric investments. The Yukhari Vang station is not an isolated facility but one component of a larger infrastructure plan. The Tartar River hosts multiple hydroelectric power stations, including the Kalbajar-1, Kalbajar-2, and Kalbajar-3 stations, which collectively enhance the energy security of the region. These projects are designed to work in tandem, optimizing water flow and power generation efficiency. The commissioning of Yukhari Vang in 2024 marks a significant milestone in this cascade development, adding to the cumulative capacity of the Tartar River system.

Azerenerji, the state-owned operator, manages these facilities to ensure stable power supply to the surrounding areas. The strategic importance of the Kalbajar District is further underscored by its geographical position, which allows for efficient transmission of generated electricity to major consumption centers in Azerbaijan. The integration of Yukhari Vang into the national grid supports the country's goal of diversifying its energy mix and increasing the share of renewable energy sources.

Project Name Location Capacity (MW) Status
Yukhari Vang Kalbajar District, Tartar River 22.5 Operational (2024)
Kalbajar-1 Kalbajar District, Tartar River [?] Operational
Kalbajar-2 Kalbajar District, Tartar River [?] Operational
Kalbajar-3 Kalbajar District, Tartar River [?] Operational

The table above illustrates the concentration of hydroelectric infrastructure in the Kalbajar District. While specific capacity figures for the Kalbajar-1, Kalbajar-2, and Kalbajar-3 stations are not detailed in the provided grounding, their existence as part of the Tartar River cascade is evident. This clustered development approach allows for shared infrastructure and operational synergies, reducing overall costs and improving maintenance efficiency. Yukhari Vang's 22.5 MW capacity adds a substantial contribution to this regional cluster, reinforcing the district's role in Azerbaijan's energy landscape.

See also