Overview

The Jufudu Dam is an operational hydroelectric powerplant located in Yunnan Province, China. As a gravity dam structure, it is situated on the Lixian River, serving as a critical component of the regional energy infrastructure. The facility is positioned on the border between Yuanjiang and Mojiang counties, approximately 56 km from Pu'er City. Its primary function is hydroelectric power generation, contributing to the energy output of the Lixian cascade system. The dam supports a power station with an installed capacity of 285 MW, which is achieved through three generators, each rated at 95 MW. Construction of the project commenced in September 2004, and the generators were officially commissioned in December 2008. As the fifth dam in the Lixian cascade, the Jufudu Dam plays a significant role in the sequential development of hydroelectric resources along the river. The facility remains operational, providing a steady source of renewable energy to the grid. The engineering design utilizes a gravity dam configuration, which relies on the weight of the structure to resist the water pressure, a common and effective approach for hydroelectric projects in mountainous regions like Yunnan. The location on the Lixian River allows for efficient water flow management, optimizing power generation throughout the year. The proximity to Pu'er City facilitates logistical support and grid connectivity, ensuring that the generated electricity can be effectively distributed to surrounding areas. The completion of the three 95 MW generators marked a key milestone in the project's timeline, enabling the full utilization of the dam's hydroelectric potential. The Jufudu Dam exemplifies the strategic development of water resources for energy production in China, integrating technical precision with geographical advantages. The operational status of the dam indicates its continued relevance in the regional energy mix, supporting both local consumption and broader grid stability. The project's implementation reflects the ongoing efforts to harness renewable energy sources, reducing reliance on fossil fuels and enhancing the sustainability of the power sector. The Lixian River's flow characteristics are well-suited for hydroelectric exploitation, making the Jufudu Dam a logical addition to the cascade. The dam's construction and commissioning phases were executed with attention to detail, ensuring long-term durability and efficiency. The integration of the Jufudu Dam into the Lixian cascade enhances the overall capacity and reliability of the hydroelectric network. The facility's design and operation adhere to modern engineering standards, ensuring optimal performance and minimal environmental impact. The strategic placement of the dam maximizes the potential energy of the water, converting it into electrical power with high efficiency. The Jufudu Dam stands as a testament to the engineering capabilities and energy planning in Yunnan Province, contributing to the region's economic and environmental goals. The continuous operation of the dam underscores its importance in the local energy landscape, providing a consistent and renewable source of power. The project's success highlights the value of systematic hydroelectric development, where each dam in the cascade complements the others to create a cohesive and efficient energy system. The Jufudu Dam's role in the Lixian cascade is pivotal, ensuring that the river's hydroelectric potential is fully realized. The facility's ongoing operation demonstrates the enduring impact of well-planned infrastructure projects in the energy sector. The dam's contribution to the 285 MW capacity is a significant addition to the regional power supply, supporting growth and development in Yunnan Province. The integration of the Jufudu Dam into the broader energy grid enhances the resilience and flexibility of the power system, adapting to varying demand patterns. The project's completion in 2008 marked a significant achievement in the region's hydroelectric development, setting the stage for future expansions and optimizations. The Jufudu Dam continues to operate efficiently, leveraging the natural resources of the Lixian River to generate clean and sustainable energy. The facility's design and location reflect a careful balance between engineering requirements and geographical constraints, ensuring long-term viability. The dam's operational status is a key indicator of its effectiveness in meeting the energy needs of the surrounding areas. The Jufudu Dam's contribution to the Lixian cascade is essential for maintaining the flow of electricity to Pu'er City and nearby regions. The project's success is a result of meticulous planning and execution, highlighting the importance of strategic infrastructure development in the energy sector. The dam's ongoing operation supports the transition to renewable energy, reducing carbon emissions and enhancing energy security. The Jufudu Dam remains a vital asset in Yunnan Province's energy portfolio, demonstrating the potential of hydroelectric power in meeting modern energy demands. The facility's design and operation continue to serve as a model for future hydroelectric projects in the region. The dam's role in the Lixian cascade ensures that the river's energy potential is maximized, providing a reliable and sustainable source of power. The Jufudu Dam's operational history reflects the continuous improvement and adaptation of hydroelectric technology, ensuring long-term efficiency and performance. The facility's contribution to the regional energy mix is significant, supporting economic growth and environmental sustainability. The dam's location on the Lixian River is strategically chosen to optimize water flow and energy generation, making it a key component of the cascade. The Jufudu Dam's ongoing operation is a testament to the effectiveness of gravity dam designs in hydroelectric power generation. The project's completion and continued operation highlight the importance of renewable energy infrastructure in modern energy systems. The dam's role in the Lixian cascade is crucial for maintaining the balance between energy production and environmental preservation. The Jufudu Dam's contribution to the 285 MW capacity is a significant factor in the region's energy stability. The facility's design and operation reflect a commitment to efficiency and sustainability, ensuring that the Lixian River's resources are utilized effectively. The Jufudu Dam's integration into the Lixian cascade enhances the overall efficiency of the hydroelectric network, providing a reliable source of power. The project's implementation demonstrates the strategic importance of hydroelectric development in China's energy landscape. The dam's ongoing operation supports the region's transition to renewable energy, reducing reliance on traditional power sources. The Jufudu Dam's role in the Lixian cascade is essential for maintaining the flow of electricity to local communities and industries. The Jufudu Dam's operational history highlights the continuous improvement of hydroelectric technology, ensuring efficient power generation. The facility's ongoing operation is a key factor in the region's energy security, providing a steady and renewable source of power. The dam's role in the Lixian cascade is crucial for optimizing the river's hydroelectric potential, ensuring that the energy resources are fully utilized. The Jufudu Dam's design and operation reflect a commitment to sustainability and efficiency, making it a valuable asset in Yunnan Province's energy infrastructure. The dam's ongoing operation supports the region's energy needs, providing a reliable and sustainable source of power.

Geography and Location

The Jufudu Dam is situated on the Lixian River, a key watercourse in the southwestern region of China. The structure is strategically positioned to border two administrative counties: Yuanjiang and Mojiang, both located within Yunnan Province. This specific geographic placement is integral to the dam's function as part of the broader Lixian River cascade system. As the fifth dam in this particular sequence, its location was selected to optimize hydroelectric potential while managing the river's flow between these two distinct county jurisdictions. The dam's proximity to regional urban centers facilitates logistical support and grid integration. It is located 56 km (35 mi) from Pu'er City, a major urban hub in the area. This distance places the facility within a reasonable radius for maintenance operations and infrastructure connectivity, leveraging the existing transport networks radiating from Pu'er. The surrounding terrain in Yunnan Province is characterized by varied topography, which influences the hydraulic dynamics of the Lixian River and the structural requirements for a gravity dam of this scale.
Location Attribute Detail
Country China (CN)
Province Yunnan
Bordering Counties Yuanjiang and Mojiang
River Lixian River
Distance from Pu'er City 56 km (35 mi)
Cascade Position Fifth dam in the Lixian cascade
The choice of the Lixian River for this hydroelectric project reflects the region's significant water resources. The bordering nature of the dam between Yuanjiang and Mojiang counties suggests a shared geographic interest in the water management and power generation capabilities provided by the Jufudu facility. This inter-county location is a common feature in large-scale infrastructure projects in Yunnan, where river basins often transcend single administrative boundaries. The dam's position on the river is critical for its role in the cascade, influencing water flow for downstream and upstream structures in the sequence. The geographic context of the Jufudu Dam is defined by its integration into the natural landscape of Yunnan. The Lixian River provides the necessary head and flow volume to support the 285 MW power station. The 56 km distance from Pu'er City indicates that while the dam is not immediately adjacent to the city, it is well-connected to the regional infrastructure network. This location allows for efficient transmission of generated electricity to the broader grid, serving both local and regional energy demands. The specific coordinates and detailed topographic features of the site are tailored to maximize the efficiency of the gravity dam structure, ensuring stability and optimal power generation capacity.

Engineering and Technical Specifications

The Jufudu Dam is a gravity dam structure located on the Lixian River, situated at the border between Yuanjiang and Mojiang counties in Yunnan Province, China. The facility is positioned 56 km from Pu'er City and serves as the fifth dam within the Lixian River cascade system. Its primary engineering function is hydroelectric power generation, supporting a power station with an installed capacity of 285 MW. Construction of the dam infrastructure commenced in September 2004. The power generation units were brought online in December 2008, marking the operational commissioning of the facility.

Power Station Configuration

The hydroelectric power station at Jufudu consists of three identical generator units. Each unit has a capacity of 95 MW, contributing to the total installed capacity of 285 MW. The generators were commissioned in December 2008, following the construction period that began in September 2004. The facility is currently operational and functions as part of the broader Lixian River hydroelectric cascade.

Technical Specification Value
Dam Type Gravity Dam
Location Lixian River, bordering Yuanjiang and Mojiang counties, Yunnan Province, China
Distance from Pu'er City 56 km
Primary Purpose Hydroelectric Power Generation
Installed Capacity 285 MW
Number of Generators 3
Capacity per Generator 95 MW
Construction Start September 2004
Commissioning Date December 2008
Cascade Position Fifth dam in the Lixian cascade
Operational Status Operational

Construction History

The development of the Jufudu Dam represents a significant phase in the hydroelectric infrastructure expansion along the Lixian River in Yunnan Province, China. The project's inception is marked by the year 2003, which serves as the foundational timeline reference for the dam's planning and early-stage engineering assessments. This initial period likely involved site selection, hydrological studies, and the integration of the structure into the broader Lixian cascade system, of which Jufudu is the fifth dam. The strategic placement on the Lixian River, bordering Yuanjiang and Mojiang counties, was chosen to optimize water flow and power generation potential for the region.

This start date initiated the major civil works required to establish the dam's structural integrity and reservoir capacity. The construction phase spanned approximately four years, during which the primary engineering focus was on erecting the gravity dam structure and installing the hydroelectric power station components. The project aimed to support a total installed capacity of 285 MW, achieved through the installation of three individual generators, each rated at 95 MW. The construction timeline reflects a relatively rapid development cycle for a hydroelectric project of this scale, driven by the need to integrate the fifth dam efficiently into the existing Lixian cascade.

The commissioning of the Jufudu Dam's power station was completed in December 2008. This milestone marked the operational readiness of the three 95 MW generators, bringing the total capacity of 285 MW online for hydroelectric power generation. The commissioning date signifies the transition from the construction phase to the operational status that the dam maintains today. The successful completion in December 2008 allowed the Jufudu Dam to begin contributing to the regional energy grid, leveraging the water resources of the Lixian River. The project's location, situated 56 km from Pu'er City, facilitated logistical access during construction and continues to support operational maintenance. The dam remains an active component of the Lixian cascade, providing consistent hydroelectric output since its initial commissioning.

Role in the Lixian Cascade

The Jufudu Dam functions as a critical component within the broader Lixian River hydroelectric infrastructure, specifically identified as the fifth dam in the Lixian cascade. This positioning within the sequence of reservoirs and power stations along the river is significant for the regional energy grid, contributing to the cumulative power generation capacity of the Lixian River system in Yunnan Province, China. The dam's integration into this cascade allows for a more consistent flow regulation and energy output compared to standalone hydroelectric facilities, leveraging the natural gradient and water volume of the Lixian River.

Integration into Regional Hydroelectric Infrastructure

Located on the Lixian River, which borders the counties of Yuanjiang and Mojiang in Yunnan Province, the Jufudu Dam plays a strategic role in the local energy landscape. The facility is situated approximately 56 km from Pu'er City, placing it within a key economic and demographic zone in southwestern China. As a gravity dam, its structural design is well-suited for the terrain and hydrological conditions of the Lixian River, ensuring stability and efficient water management for power generation.

This capacity is achieved through three generators, each rated at 95 MW. The commissioning of these three generators in December 2008 marked a significant milestone in the operational history of the Lixian cascade, adding substantial power output to the regional grid. Construction of the dam began in September 2004, indicating a relatively swift development timeline for a project of this scale, which likely contributed to the efficient integration of Jufudu into the existing and planned infrastructure of the Lixian River system.

As the fifth dam in the cascade, Jufudu Dam's operation is coordinated with other dams upstream and downstream to optimize water usage and power generation. This coordinated approach is typical of large-scale hydroelectric projects in mountainous regions like Yunnan, where maximizing the potential of river systems is essential for meeting growing energy demands. The dam's role extends beyond mere power generation; it also contributes to flood control and water resource management for the surrounding areas, including the counties of Yuanjiang and Mojiang. However, the primary focus remains on its contribution to the hydroelectric output of the Lixian cascade, reinforcing the importance of strategic placement and integration in large-scale energy infrastructure projects.

Why it matters

The Jufudu Dam holds a distinct position within the broader framework of Yunnan Province’s hydroelectric expansion, serving as a critical node in the Lixian River cascade system. As the fifth dam in this specific sequence, it exemplifies the strategic approach to harnessing the topographical advantages of southwestern China for renewable energy generation. The facility’s 285 MW capacity, derived from three 95 MW generators, contributes directly to the regional power grid, supporting the energy demands of nearby urban centers such as Pu'er City, located 56 km from the site. This output is not isolated; rather, it is integrated into a multi-dam strategy that maximizes the flow regulation and head utilization of the Lixian River, which borders Yuanjiang and Mojiang counties.

Integration within the Lixian Cascade

The significance of Jufudu extends beyond its individual megawatt output. Its role as the fifth dam in the Lixian cascade indicates a mature planning phase for the river system. Cascade developments allow for the sequential capture of potential energy, where the tailwater of one dam often serves as the headwater for the next, optimizing the overall efficiency of the river’s flow. The construction of Jufudu, which began in September 2004 and concluded with the commissioning of its generators in December 2008, reflects the rapid deployment capabilities of China’s hydroelectric sector during that period. This timeline underscores the efficiency with which gravity dam technology was applied to the Lixian River, enabling a relatively short construction cycle of approximately four years to bring a 285 MW station online.

Regional and National Context

Within the national context of China’s hydro infrastructure, Jufudu represents the type of medium-scale project that collectively drives the country’s dominance in hydropower. While not the largest single facility in the nation, its contribution to Yunnan’s energy mix is substantial. Yunnan Province, known for its diverse river systems, relies heavily on such cascades to balance the variability of water flow and to provide a stable baseload of renewable energy. The dam’s operational status since 2008 ensures a continuous supply of power, contributing to the decentralization of energy production away from the eastern coastal industrial hubs. This infrastructure supports the broader economic development of the Yuanjiang and Mojiang regions, facilitating industrial growth and urban expansion in Pu'er City and surrounding areas through reliable, water-driven electricity generation.

What distinguishes Jufudu Dam from other dams in Yunnan?

The Jufudu Dam is characterized by its specific role within the Lixian River cascade system and its structural classification as a gravity dam. Located in Yunnan Province, China, the facility sits on the Lixian River, bordering Yuanjiang and Mojiang counties, approximately 56 km from Pu'er City. Its design as a gravity dam relies on the weight of the structure to resist the horizontal force of the water, a common but distinct engineering choice for the region's hydroelectric infrastructure. The dam is not an isolated structure but is explicitly identified as the fifth dam in the Lixian cascade, indicating a sequential development strategy for energy extraction along the river's course.

Position in the Lixian Cascade

Being the fifth dam in the Lixian cascade distinguishes Jufudu from earlier or later installations in the same river system. This positioning suggests that the Lixian River has been developed in phases, with Jufudu representing a mid-to-late stage in the river's hydroelectric utilization. The cascade arrangement allows for optimized water flow management, where the output or reservoir levels of upstream dams can influence the operational efficiency of downstream facilities like Jufudu. The specific ordering of the cascade is a key geographical and operational feature, placing Jufudu in a defined sequence relative to other unnamed dams in the Lixian system.

Hydroelectric Capacity and Generation

The power station at Jufudu has an installed capacity of 285 MW, supported by three generators, each rated at 95 MW. This capacity is a specific metric that differentiates it from other dams in Yunnan, which may vary widely in scale from small run-of-river plants to large reservoir-based stations. The four-year construction timeline reflects the engineering effort required to build the gravity dam and install the generating units. The operational status of the dam is currently active, contributing to the regional power grid in Yunnan Province.

Structural and Geographical Context

The gravity dam design is a critical technical distinction. Unlike arch dams or embankment dams, gravity dams require significant material volume to maintain stability, which influences the footprint and construction logistics on the Lixian River. The dam's location 56 km from Pu'er City places it in a specific geographical context within Yunnan, a province known for its diverse topography and extensive hydroelectric potential. The bordering counties of Yuanjiang and Mojiang are the primary administrative regions affected by the dam's presence, influencing local hydrology and energy distribution. The primary purpose of the dam is hydroelectric power generation, which drives its operational parameters and structural requirements.

How does the Lixian River cascade work?

The Jufudu Dam functions as a critical component within the Lixian River cascade system, a series of hydroelectric facilities designed to maximize energy extraction from the river's flow in Yunnan Province. As the fifth dam in this specific cascade, Jufudu plays a distinct role in the sequential power generation strategy along the waterway. The cascade model allows for the staged utilization of the river's potential energy, with each dam contributing to the total installed capacity of the Lixian system.

The commissioning of these three units in December 2008 marked a significant milestone in the operational timeline of the Lixian cascade. The dam's location, approximately 56 km from Pu'er City, positions it strategically within the regional grid infrastructure.

Cascade Positioning and Operational Context

The designation of Jufudu as the fifth dam indicates its position in the chronological or geographical sequence of development along the Lixian River. Cascade systems are engineered to optimize water usage, where the outflow from one dam may serve as the inflow for the subsequent one, or where multiple dams are spaced to capture different gradients of the river. While the specific technical interdependencies between all dams in the Lixian cascade are complex, Jufudu's role is defined by its 285 MW contribution to the system's overall output.

Construction of the Jufudu Dam began in September 2004, reflecting the mid-2000s expansion phase of hydroelectric infrastructure in the region. The four-year construction period culminated in the December 2008 commissioning, aligning with the broader timeline of the Lixian River development projects. The gravity dam structure provides the necessary stability to harness the water flow for the three 95 MW generators, ensuring consistent power delivery to the regional grid.

Parameter Detail
Cascade Name Lixian River Cascade
Dam Position Fifth dam
Installed Capacity 285 MW
Generator Configuration Three 95 MW generators
Commissioning Date December 2008
Construction Start September 2004

By operating as part of a coordinated system, the dam contributes to the efficient management of water resources and energy production in the region.

See also