Overview
The Tarkhankut Wind Farm is an operational wind energy facility located in the Autonomous Republic of Crimea, Ukraine. It is situated on the Tarkhankut Upland, a highland region that covers the majority of the Tarkhankut Peninsula and forms part of the North Crimean Plain. The installation is positioned in proximity to Donuzlav Lake, a significant geographical feature in the area. As a state property, the wind farm represents a component of the regional energy infrastructure in the Crimean region.
The facility has a total installed capacity of 2.26 MW. It was commissioned in 2001, marking its entry into service during the early phase of wind energy development in the region. The operator of the Tarkhankut Wind Farm is Windenergo Ltd., which manages the operational aspects of the installation. The primary energy source for the plant is wind, consistent with the geographical characteristics of the Tarkhankut Peninsula, which offers suitable conditions for wind energy generation due to its elevated terrain and exposure to regional wind patterns.
The Tarkhankut Upland provides the topographical context for the wind farm's location. This highland area is integral to the landscape of the Tarkhankut Peninsula, contributing to the wind resource availability that supports the operation of the facility. The wind farm's status as a state property indicates its role within the broader energy portfolio of the Autonomous Republic of Crimea, contributing to the diversification of energy sources in the region.
The commissioning of the Tarkhankut Wind Farm in 2001 established it as one of the earlier wind energy installations in the area. With a capacity of 2.26 MW, the plant contributes to the local grid and serves as a reference point for wind energy development in the Crimean region. The operation by Windenergo Ltd. ensures the continued functionality of the facility, maintaining its status as an active component of the energy infrastructure. The location near Donuzlav Lake and within the Tarkhankut Upland underscores the strategic placement of the wind farm to maximize wind resource utilization.
The Tarkhankut Wind Farm operates within the regulatory and administrative framework of the Autonomous Republic of Crimea. As a state-owned asset, it is subject to the management and oversight structures applicable to public energy infrastructure in the region. The facility's operational status remains active, with Windenergo Ltd. continuing to manage its performance and integration into the local energy system. The wind farm's contribution to the energy mix in Crimea reflects the region's efforts to incorporate renewable energy sources, particularly wind, into its power generation capacity.
Technical Specifications and Capacity
The Tarkhankut Wind Farm is a small-scale wind energy installation located in Ukraine, specifically within the geographic area of the Tarkhankut Upland. The facility is currently operational and is managed by Windenergo Ltd. The installed capacity of the wind farm is 2.26 MW, generated by a total of 21 wind turbines. This configuration represents a specific technical realization that differs significantly from earlier planning stages for the site.
Installed Capacity and Turbine Configuration
The technical profile of the Tarkhankut Wind Farm is defined by its 21 operational wind turbines. These units collectively produce a total installed capacity of 2.26 MW. The operator, Windenergo Ltd., maintains the facility as part of the broader energy infrastructure in the area. The commissioning date of 2001 places the plant among the earlier wind energy projects in the country. The current operational status indicates that the turbines are active contributors to the local energy mix, utilizing the wind resources available in the Tarkhankut region.
| Parameter | Value |
|---|---|
| Entity Type | Wind Farm |
| Country | Ukraine |
| Operator | Windenergo Ltd. |
| Commissioned | 2001 |
| Operational Status | Operational |
| Number of Turbines | 21 |
| Installed Capacity | 2.26 MW |
| Primary Fuel/Source | Wind |
Comparison with Planned Capacity
There is a notable discrepancy between the actual installed capacity and the originally planned capacity for the Tarkhankut Wind Farm. While the current operational capacity stands at 2.26 MW, the planned capacity for the site was 70 MW. This difference highlights the evolution of the project from its initial conceptualization to its realized technical specifications. The reduction from the planned 70 MW to the operational 2.26 MW reflects various factors in the development and deployment of the wind energy infrastructure at this specific location. The 21 turbines currently in service represent the physical implementation of the project as of its commissioning and subsequent operational history.
Significance
The Tarkhankut Wind Farm represents a distinct chapter in the renewable energy infrastructure of the Autonomous Republic of Crimea, serving as one of the earliest operational wind energy assets in the region. Located within the Tarkhankut Upland, a highland covering most of the Tarkhankut Peninsula and forming part of the North Crimean Plain, the facility leverages the specific topographical advantages of this geographical feature for wind energy capture. The site is operated by Windenergo Ltd., which manages the installation as an active, operational energy source. The facility was commissioned in 2001, marking an early phase of wind power development in the area, preceding many subsequent regional expansions.
Capacity and Development Gap
A defining characteristic of the Tarkhankut Wind Farm is the significant disparity between its initial installed capacity and the broader strategic plans for the site. This figure stands in contrast to the planned capacity of 70 MW that was originally envisioned for the location. This gap highlights the phased and often incremental nature of early wind farm development in the region, where initial installations served as proof-of-concept or foundational steps toward larger aggregate targets. The 2.26 MW output, while modest compared to the 70 MW projection, established the Tarkhankut site as a functional component of the local energy mix, utilizing wind as its primary fuel source.
The operational status of the farm remains active, indicating sustained utility despite the under-realization of the initial 70 MW plan. The decision to proceed with the 2.26 MW installation reflects the technical and economic realities of wind energy deployment in the early 2000s in Crimea. The Tarkhankut Upland's position within the North Crimean Plain provides a strategic location for wind capture, justifying the initial investment by Windenergo Ltd. The facility serves as a reference point for understanding the evolution of wind infrastructure in the peninsula, illustrating how early projects often began with smaller capacities before potential expansions or new adjacent developments. The contrast between the 2.26 MW realized capacity and the 70 MW planned figure underscores the complexity of translating regional energy goals into immediate operational assets.
As an early state-associated or state-owned asset in the context of Crimean energy infrastructure, the Tarkhankut Wind Farm contributes to the historical record of renewable energy adoption in the region. Its commissioning in 2001 places it among the pioneering wind installations in the Autonomous Republic of Crimea, providing data and operational experience for subsequent projects. The facility continues to function as a wind farm, maintaining its role in the local energy landscape. The specific details of the 2.26 MW capacity and the 70 MW planned target are critical for analysts evaluating the historical efficiency and planning accuracy of early wind energy investments in the Tarkhankut Peninsula. ensures that the site remains a relevant case study for the development of wind power in the North Crimean Plain.
See also
- Middle Dnieper Hydroelectric Station: Infrastructure and Operations
- AZMOL British Petrochemicals: History, Ownership and Operations
- South Ukraine Nuclear Power Plant
- Burshtyn TPP: Infrastructure, Grid Integration, and War Damage
- Zaporizhzhya Nuclear Power Plant: Technical Profile and Operational History