Overview

The Narude Dam is a gravity dam situated on the Shō River, located approximately 22 km south of Nanto on the border of Toyama and Gifu Prefectures in Japan. It serves as a key component of the regional hydroelectric infrastructure, housing an associated power station with an installed capacity of 97 MW. The facility is operated by the Kansai Electric Power Company and has remained in operational status since its initial commissioning in 1951. The dam is the sixth furthest downstream of the nine dams that characterize the Shō River’s hydroelectric cascade.

Construction and Commissioning

Construction of the Narude Dam commenced in 1950 and was completed in 1952. The associated hydroelectric power station was developed in two distinct phases. The first part of the power station was commissioned in 1951, marking the initial operational milestone for the facility (Ground Truth; Wikipedia). The second part of the power station followed later, commissioned in 1975, thereby expanding the infrastructure’s generating capabilities over time. This phased approach reflects the evolving energy demands of the region during the mid-20th century.

Geographic and Hydrologic Context

Located on the Shō River, the Narude Dam plays a strategic role in the river’s multi-dam system. As the sixth dam from the downstream end, it contributes to the regulation and energy extraction of the Shō River’s flow, working in concert with the other eight dams in the sequence. The dam’s position on the border between Toyama and Gifu Prefectures underscores its importance to the shared hydroelectric resources of these two regions. The gravity design of the dam provides structural stability, utilizing the weight of the structure to resist the horizontal force of the water, a common engineering choice for large-scale hydroelectric projects in Japan.

Geography and Location

The Narude Dam is situated on the Shō River, a key waterway in the Chūbu region of Japan. Its strategic location places it precisely on the administrative border between Toyama Prefecture and Gifu Prefecture, making it a shared geographical feature for two distinct prefectural jurisdictions. This positioning is significant for regional water management and hydroelectric generation, as the river flows through the mountainous terrain separating these two areas. The dam is one of nine dams constructed along the Shō River system, ranking as the sixth furthest downstream in the sequence of hydraulic structures. This ordering reflects the progressive development of hydroelectric capacity along the river's course, with Narude playing a central role in the mid-to-lower reaches of the river system.

Proximity to Nanto

The dam is located approximately 22 km (14 mi) south of the city of Nanto. Nanto serves as a primary reference point for locating the facility within Toyama Prefecture, providing a clear geographical anchor for regional planning and access. The distance underscores the dam's position in a relatively accessible yet distinct area, balancing proximity to urban infrastructure with the natural topography required for gravity dam construction. This location facilitates logistical operations for the Kansai Electric Power Company, which operates the associated hydroelectric power station.

Location Detail Value
River Shō River
Country Japan
Prefectures Toyama and Gifu
Distance from Nanto 22 km (14 mi) south
Position in River System Sixth furthest downstream of nine dams

Construction and Development History

The structure serves as a key component of the hydroelectric infrastructure in the region and is the sixth furthest downstream of the nine dams located along the Shō River system. The construction of the dam took place between 1950 and 1952, establishing the primary water retention structure necessary for the associated power generation facilities. This initial construction phase focused on the gravity dam itself, which provides the head required for the hydroelectric power station that would follow.

Power Station Commissioning

The associated hydroelectric power station, which has a total installed capacity of 97 MW, was not commissioned all at once but rather in two distinct phases. This early commissioning date indicates that the power generation infrastructure was largely complete even while the broader dam construction was still concluding in 1952. The operator of the facility is Kansai Electric Power Company, which has managed the operational status of the plant since its inception. The first phase of commissioning allowed for the initial utilization of the water resource for electricity generation, integrating the Narude Dam into the regional power grid relatively quickly after construction began.

The second part of the power station was commissioned significantly later, in 1975. This second phase of development expanded the capacity and operational capabilities of the Narude hydroelectric power station. The gap between the first commissioning in 1951 and the second in 1975 suggests a period of operational maturity followed by a subsequent expansion or modernization effort to increase the output of the 97 MW facility. The two-part commissioning strategy allowed for a phased integration of the power generation assets, potentially accommodating changes in energy demand or technological advancements in hydroelectric equipment over the two decades between the two milestones. The dam remains operational, continuing to contribute to the energy infrastructure of the Kansai region through its gravity dam structure and associated power station on the Shō River.

Technical Specifications

It is positioned approximately 22 km south of Nanto. Construction of the dam took place between 1950 and 1952. The associated hydroelectric power station has a total installed capacity of 97 MW. The first part was commissioned in 1951, and the second part was commissioned in 1975. The facility is operated by Kansai Electric Power Company and remains operational.

Dam and Power Station Data

Parameter Value
Dam Type Gravity dam
River Shō River
Location Border of Toyama and Gifu Prefectures, Japan
Distance from Nanto 22 km south
Construction Period 1950–1952
Operator Kansai Electric Power Company
Total Capacity 97 MW
Commissioning (Part 1) 1951
Commissioning (Part 2) 1975
Status Operational

The power station's 97 MW capacity is divided into two parts: a 37 MW section and a 60 MW section. The first part, with a capacity of 37 MW, was commissioned in 1951. These two parts together form the complete hydroelectric power station associated with the Narude Dam. The dam's position as the sixth dam downstream on the Shō River places it within a larger cascade of hydroelectric infrastructure in the region.

What is the role of the Narude Dam in the Shō River system?

The Narude Dam functions as a critical intermediate node within the complex hydroelectric infrastructure of the Shō River basin. Positioned on the border of Toyama and Gifu Prefectures, the structure is not an isolated installation but rather the sixth furthest downstream of the nine dams that characterize the river's flow. This specific ordinal position dictates its operational role, serving as a balancing mechanism between the significant water volume accumulated from upstream reservoirs and the final stages of power generation leading toward the river's mouth.

Integration with Upstream and Downstream Infrastructure

The operational dynamics of the Narude Dam are defined by its relationship with its immediate neighbors in the Shō River cascade. Upstream, the Tsubawara Dam plays a crucial role in regulating the initial flow of water that eventually feeds into Narude. The coordination between these structures ensures that water release from Tsubawara is optimized to maintain consistent head levels at Narude, thereby maximizing the efficiency of its 97 MW hydroelectric power station. This upstream dependency means that Narude does not operate in a vacuum; its intake volumes are directly influenced by the storage and release schedules of the Tsubawara reservoir.

Downstream, the Narude Dam interacts with the Akao Dam. As the sixth dam in the sequence, Narude releases water that continues to drive the turbines at Akao and subsequent downstream facilities. This sequential arrangement allows for the "run-of-river" style utilization of the Shō River, where water is used multiple times for power generation as it descends in elevation. The gravity dam design of Narude provides the necessary structural stability to manage these fluctuating flows while maintaining the water levels required for the Akao Dam's intake. The construction of Narude between 1950 and 1952 established a foundational layer for this cascade, with the power station itself being commissioned in two phases, first in 1951 and later expanded in 1975 to increase capacity.

This strategic placement as the sixth dam allows Narude to capture the cumulative energy potential from the upper Shō River while preparing the water flow for the final stages of the hydroelectric chain. The coordination between Tsubawara, Narude, and Akao exemplifies the integrated management of Japan's riverine energy infrastructure, where each dam's operation is synchronized to optimize the total energy output of the Shō River system.

Operational Management

The Narude Dam and its associated hydroelectric power station are operated by Kansai Electric Power Company, a major utility serving the Kansai region of Japan. As the primary operator, Kansai Electric Power Company manages the facility’s generation output, maintenance schedules, and integration into the broader regional grid. The dam serves as a critical component of the multi-dam system on the Shō River, which features nine dams in total. Within this sequence, Narude Dam is positioned as the sixth furthest downstream, playing a specific role in regulating water flow and generating power for the surrounding prefectures.

Geographic and Administrative Context

The facility is situated in a geographically significant location on the border of Toyama and Gifu Prefectures. It is located on the Shō River, approximately 22 km south of the city of Nanto. This placement on the prefectural border means the dam’s operational management and environmental impact involve administrative considerations for both regions. The proximity to Nanto, a city in Toyama Prefecture, and the bordering areas of Gifu Prefecture, including the Shirakawa region, underscores the dam’s importance to local infrastructure and water resource management.

The Shō River basin is a key hydroelectric resource in central Japan. The construction of the Narude Dam between 1950 and 1952 was part of a broader effort to harness the river’s potential for energy production. The power station was developed in two phases, with the first part commissioned in 1951 and the second part added in 1975. This phased approach allowed for incremental expansion of the 97 MW capacity, adapting to the energy demands of the growing region. The gravity dam design provides structural stability and efficient water retention, essential for consistent hydroelectric generation in the mountainous terrain of the Shō River valley.

Kansai Electric Power Company’s management of the Narude Dam involves coordinating with local municipalities and prefectural governments to ensure optimal water usage for both power generation and downstream needs. The dam’s location on the border requires collaborative governance to address issues such as water rights, environmental conservation, and flood control. The operational history of the dam reflects the long-term investment in hydroelectric infrastructure in Japan, with the facility continuing to contribute to the energy mix of the Kansai region decades after its initial commissioning.

Significance

The Narude Dam holds a distinct position within the hydroelectric infrastructure of central Japan, specifically along the Shō River basin. As a gravity dam, it represents the engineering standards of the mid-20th century, constructed between 1950 and 1952. Its operational history reflects the phased development of Japan's post-war power grid. The associated hydroelectric power station, operated by Kansai Electric Power Company, was not commissioned all at once but in two distinct stages. The first part of the station began operations in 1951, providing immediate capacity to the regional network, while the second part was added significantly later, in 1975. This two-part commissioning strategy allowed for a gradual integration of the 97 MW total capacity into the grid, balancing construction costs with energy demand during the 1950s and 1970s.

Position within the Shō River Cascade

The Shō River is a significant hydrological feature for power generation in the border region between Toyama and Gifu Prefectures. The river hosts a cascade of nine dams, creating a stepped energy extraction system. The Narude Dam is located approximately 22 km south of Nanto, situated on the prefectural border. Within this specific sequence, it is the sixth dam furthest downstream. This mid-stream positioning is critical for the hydraulic efficiency of the entire Shō River system. Dams further upstream capture initial flow and elevation head, while those downstream, including Narude, manage the regulated discharge and residual head to maximize turbine output. The gravity design of the Narude Dam provides structural stability suitable for the river's flow characteristics, ensuring reliable operation for Kansai Electric Power Company.

The dam's contribution to the regional network is defined by its 97 MW capacity. While individual capacity figures are modest compared to modern mega-dams, the cumulative effect of the nine-dam cascade on the Shō River creates a substantial baseload power source for the Kansai region. The operational status of the Narude Dam remains active, indicating that the infrastructure commissioned in the early 1950s and expanded in the mid-1970s has maintained its engineering integrity over several decades. This longevity underscores the robustness of the gravity dam construction methods used during the 1950–1952 building period. The dam continues to serve as a key node in the water-to-energy conversion process for the Shō River, supporting the broader energy security of the Kansai Electric Power Company's service area.